Unlicensed Electricity Application Process
The documents submitted by the relevant investor are examined by the distribution company and a technical evaluation is made. Technical A connection agreement shall be called by the relevant distribution company to the applicants whose evaluation result is positive. letter is given. The call letter includes information such as port, line distance and line type. Investors who receive the call letter must complete the project approval within 180 days. TEDAŞ together with the necessary documents within 90 days from the notification date of the call letter. It has to apply to the General Directorate of project acceptance and approval processes.


Project approval and acceptance application made to the General Directorate of TEDAŞ The following documents must be included in the file.


  • Call letters of connection agreement received from the relevant distribution company,

  • Approved project of the facility,

  • General layout of the plant,

  • Fire detection, alarm and extinguishing systems diagram,

  • Grounding and lightning protection plans scheme,

  • AG, YG single line diagram,

  • AG, YG cable distribution plan,

  • Site plan,

  • The contract signed between the facility owner and the contractor,

  • Short circuit calculations,

  • System connection view,

  • System connection agreement,

  • Certificates of conformity,

  • EIA document,

  • Facility information form,

  • Letter of authorization given by the facility owner of the person who will participate in the delegation on behalf of the facility owner for the temporary admission procedures or power of attorney,

  • Discovery ruler,

  • Tax plate, trade registry gazettes, signature circular of authorized persons,

  • Grounding resistance measurement report,

  • Technical Evaluation Report by the General Directorate of Renewable Energy,

  • Project approval letter and zoning letter,

  • Each equipment of solar energy technology to be used in the facility (pv module, inverter, reflective surface, focuser system) information and documents showing the electrical and physical technical features,

  • Company designing the system, contact person and contact information

  • The static and dynamic loads of the components of solar energy technology to be installed with snow, ice and wind loads It has been approved by the Special Provincial Administration or the Municipality that the strength calculations under the influence of letter of conformity,




Approved by the Special Provincial Administration or the Municipality showing that the area where the facility will be built is suitable for installing a GES Application is made with a letter of eligibility. If the application is approved after the information and documents are reviewed, the project approval fee is paid and the project is confirmed. The project owner is given a "project approval" document. Obtaining this document will allow the construction of the production facility to begin. means i.


A connection and system usage agreement is signed with the relevant distribution company within 30 days after the project approval process. After the connection agreement is made, the facility is completed within 24 months. Except for force majeure, these periods In the event that the production facility is not completed at the end, the permit documents related to the connection agreement will be automatically issued. becomes invalid.
Free Discovery

News & Announcements

23-26 March SOLAR ISTANBUL FAIR

You are invited to our stand held at VIA POR MARINA. Hall 8 Stand 834
examine

NEWSLETTER

Contact


Fevziçakmak Mh. 10632.Sk. No:2/A
İç Kapı No:101 Karatay/KONYA